Bathroom Asbestos Abatement Before and After
This is a high-risk asbestos abatement project we completed in the Kitsilano area. Our client had asbestos-containing drywall joint compound throughout their condo. They also had asbestos-containing vinyl sheet flooring throughout the home. We removed the drywall ceiling, insulation, and vinyl sheet flooring using High Risk Work Procedures which included the following:
- three stage decontamination unit with shower
- on-site DOP Testing for all Hepa equipment
- daily air monitoring and air clearance (thanks to Lotus Environmental)
Once we received our air clearance results, we were informed that our hazardous material concentrations were above and beyond what’s considered a “pass”. After the high-risk tasks were accomplished, we spent the day safely removing the containment and bags of asbestos-containing material using moderate risk work procedures.
Leave Us a Google Review
Your feedback keeps us accountable and helps others choose responsibly.
Two Office Locations
Vancouver
Progressive Environmental
1816-68 Smithe St.
Vancouver BC V6B-0P4
Vancouver Island
Progressive Environmental
1-264 Craig St.
Nanaimo, BC. V9R-3V5
Progressive Environmental
Let’s Build a Safer Site Together
From testing to teardown, we’re here to help you move forward with clarity.
Reach out anytime. We’ll walk you through what matters for your site.